108 North Terrace

108 North Terrace
Category:
Commercial - Base Build
Delivery:
Design & Construct
Value:
$12.5m

A multi-storey base build refurbishment, including upgrade of common areas, and an end of trip facility.

The project brief included provision of a new ‘End of Trip Facility’. Notably, this included; bike storage, toilet and shower blocks, locker services, new toilets to facilitate 11 levels, refurbishment of the main lobby and foyer, revamped lift lobbies to 10 levels, floor/ceiling upgrades and refurbishments of multiple levels, upgraded BMS and Fire control systems throughout, and the installation of Cbus controlled T5 lighting, and new cooling towers.

Construction was spread over an 18 month period to accommodate the varying needs of both the building owner and tenants and as all works were completed during tenant occupancy; open lines of communication and considerable staging, coordination and programming measures with building management and tenants ensured efficiency and fluency at all stages. The project was completed to schedule and executed by the Cook team to the high satisfaction of the client.

108 NT
108 NT